Maharatia (Anita Bay / Te Repo Repo Relaunched

image15AH

image0AH

image23

MAHARATIA RELAUNCHED
 
Last week in the WW inbox up popped a note from Troy and Dave Searle the owners of the 1947 Roy Lidgard built – Maharatia, the subject line said “Maharatia (Anita Bay) Update”. Well woodys that was an understatement, I can report that Maharatia has been relaunched 🙂
Firstly excuse me while I rewind – back in August 2015 Paul Drake sent me a single b/w photo (c.1960’s) of a rather large woody on the back of a truck in Taupo. Paul commented that the launch was Te Repo Repo as she was named while operating commercially on the lake.
That single photo (below) ignited one of the biggest chat sessions on WW, there have been over 64 comments posted around the boats provenance.
I attempted to summarize it into one read, which you will find along with a great photo gallery of her past at the WW link below. Make sure you read the comments, start at the bottom 😉 
 
 
Now back to the the Searle’s email – I have reproduced it below – rather a big project – well done guys, amazing effort – email me your T-shirt sizes and I will gift you a couple of WW t-shirts. Hopefully in person at this weekends Mahurangi Regatta.
 
“Well finally after a 4 1/2 years restoration we have relaunched Maharatia.
Last Wednesday (8th Jan 2020) Boat Haulage safely transported her up to Dockland 5 in Whangarei from the boat shed at Omaha. 
She is now berthed in Marsden Cove Marina
Colin Brown, Josh Hawke and owner Dave Searle have worked hard to help bring her back to a very solid representation of her former glory.
Just a brief overview of the restoration work
– Replaced 23 frames in hull
– Replaced garboard plank
– Replaced all keel bolts
– Replaced all through hull skin fittings
– Re-corked hull
– Replaced worm shoe
– Rebuilt shaft logs
– Rebuilt rudder logs
– New diesel tanks 
– Motors (2 x 6LX Gardner) rebuilt by Shaw diesels Ltd
– Replaced all fuel systems, lines and filters.
– Complete rehire and re-plumbed.
– All new toughened glass windows
– New dash panel, gauges and instruments
– New Interior, saloon and galley
– Raised and built new roof to increase headroom by 80mm
– New shower/head room built in.
– New capping on rail
– New exhaust system
– All porthole windows removed, new glass and seals fitted.
– 2 new hatches made. Fwd cabin and roof top.
– New anchor winch
– Aft deck, seating and storage compartments made and hatch to lazarette installed.
 …and Lastly a full repaint.
 
Looking forward to spending our summer on the water this year! 
We hope to be at the Mahurangi regatta In a few weeks time and catching up with other woody enthusiasts.”
Screen Shot 2020-01-19 at 7.42.09 PM

1 thought on “Maharatia (Anita Bay / Te Repo Repo Relaunched

  1. Mmmm. Yummy. Well done all! So much better without that extra command module up top. Look forward to seeing you out and about.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s