HERRESHOFF STEAM LAUNCH – Sea Trial

HERRESHOFF STEAM LAUNCH – Sea Trial

On Friday Chris McMullen dropped me a note to say the 34′ steam launch was now running and had just completed its first sea trial. Chris commented the boat is doing hull speed at about 150 PSI but the boiler should produce 250 PSI, but needs some adjustment as the smoke is as a result of the burner not working properly. The hull floats as per the design and the machinery is all working as it should.

I have included below links to past WW stories on the project. If you are time poor, the 2021 will give you an insight into the project.

WW July 7 – 2014 https://waitematawoodys.com/2014/07/07/chris-mcmullens-herreshoff-steam-launch/
WW July 11 – 2014 https://waitematawoodys.com/2014/07/11/chris-mcmullen-herreshoff-steam-launch-part-2-the-engine/
WW April – 2021 https://waitematawoodys.com/2021/04/26/chris-mcmullens-herreshoff-steam-launch-2/

1 thought on “HERRESHOFF STEAM LAUNCH – Sea Trial

  1. Absolutely brilliant Chris. You have persevered for a long time with a magnificent result

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s