Ballerina Restoration – Revisited


 

IMG_0834

Haul out at Omaha

Haul-out

 

IMG_0832

BALLERINA REFURBISHMENT

photos & details ex James Groenhart

I spied Ballerina at Mahurangi during the 2016 Regatta weekend & she was looking superb. James told me she had recently spent 5 weeks in the care of Colin Brown & Dave Walker at Jones Road, Omaha (same site as Anita Bay & Little Tasman). While she was structurally in great condition there were some areas that needed attention.

Colin & Dave completed the following work to a superb standard, & interpreted what James wanted perfectly, as well as being completely sympathetic to the character of the boat.

  • A new hardwood worm shoe was made & fitted.
  • Mahogany cabin sides & coamings were taken back & minor rot repairs carried out, particularly around the sliding side windows & timber fixed window beading.
  • Butterfly skylight hatch was restored & glass re set to stop leaks.
  • A new timber forehatch was made & fitted.
  • Duckboard deck was replaced.
  • Cabin top grab rails removed, restored & re fastened.
  • Repainted hull (using Altex ‘Classic White’), cabin sides & deck.

Great to see work like this recorded so thoroughly.

Click photos to enlarge.

Another Record Viewing Day Yesterday !!!!!!

One thought on “Ballerina Restoration – Revisited

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

w

Connecting to %s